Archive

When the boiler at the Central Materials Lab in Sandston needed to be replaced, the Virginia Department of Transportation turned to Brockenbrough.  The aging fire-tube boiler was replaced with two modular boilers.  Each modular boiler was sized for two-thirds of the building heating load to...

The Rare Children’s Book Collection is housed in the Davenport Special Collections Room of the Main Library, 101 E. Franklin Street. This collection includes international and American children’s books of historical interest from the 18th century to the 21st century. Specific collections include Rare Children’s...

When the chiller at the historic Old City Hall in Richmond, Virginia needed to be replaced, the Virginia Department of General Services turned to Brockenbrough. The aging 250 ton chiller was located in a mechanical room under a pedestrian plaza. To install a replacement would...

This building includes a large training bay where industries can educate their employees on the use of new technology and manufacturing equipment. The facility contains a distance learning auditorium, computer labs, classrooms and offices. It was designed to project an image of a traditional educational building...

Henrico County was looking to add educational space and classrooms for kindergarten through second grades at Mehfoud Elementary School. This addition included twelve state-of-the-art classrooms and three learning centers designed for small group instruction. The project also covered expansion and renovations to the existing cafeteria.   Services included planning, schematic...

This project involved renovation of all eight branches of the Richmond Public Library System as well as improvements to the Main Library. The primary focus was upgrading the technology infrastructure and replacing the lighting and interior finishes. Each branch was evaluated during schematic design. Changes...

Brockenbrough was responsible for the design of ten new or renovated customer service centers for the Virginia Department of Motor Vehicles.  Each center contained a state-of-the-art teller line designated to streamline the service process thereby creating a better experience for the customer and an ergonomically...

The owner of this website has made a commitment to accessibility and inclusion, please report any problems that you encounter using the contact form on this website. This site uses the WP ADA Compliance Check plugin to enhance accessibility.