Archive

Wastewater treatment influent headworks at the Northwest Naval Support Activity for the Naval Facilities Engineering Command. The headworks include an auger screen for removal of solid trash, a grit screw for removal of particulate debris, and automatic controls.  The control systems for the auger screen...

Brockenbrough was the Prime Consultant for replacement of three Interstate Welcome Centers and Safety Rest Areas.  The existing facilities were demolished and replaced with a new “prototype” design.  Work was completed under a record breaking fast-track design and construction period.  Design phase through full BCOM...

Brockenbrough provided bid documents for a new JP-5 fuel farm with two 500,000 gallon tanks, two 1,200 gpm pumphouses (one on top of each tank), a 1,200 gpm filtration building, and a 600 gpm truck off-loading station.   The project connected these new tanks to a six...

In preparation for the receipt of MV-22 helicopters, the existing parking apron striping was removed and a new parking plan was designed. Because of extreme high temperatures subjected to the concrete by the MV-22 down blast, special concrete coatings, heat resistant joint sealants and high temperature...

The owner of this website has made a commitment to accessibility and inclusion, please report any problems that you encounter using the contact form on this website. This site uses the WP ADA Compliance Check plugin to enhance accessibility.