Archive

Brockenbrough was the Prime Consultant for replacement of three Interstate Welcome Centers and Safety Rest Areas.  The existing facilities were demolished and replaced with a new “prototype” design.  Work was completed under a record breaking fast-track design and construction period.  Design phase through full BCOM...

Brockenbrough provided complete right-of-way and construction plans, and construction administration for improvements to Old Bermuda Hundred Road and Old Stage Road in Chesterfield County.  Work included widening and reconstruction of 2,200 linear feet of roadway including intersection safety improvements.  Brockenbrough was responsible for surveying, roadway...

Brockenbrough provided structural and civil engineering for this new 225 foot pedestrian bridge on the University of Richmond campus.   Work included plans and specifications for a prefabricated steel truss bridge approximately 225’ long by 8’ wide.  The bridge was constructed of weathering steel with a composite deck and...

This project included park and trail improvements consisting of a new observation platform, a railroad trestle pedestrian bridge, replacement of a service road bridge, improved access to the mine ruins, and new trails.  Brockenbrough provided complete civil engineering, structural engineering and surveying.  Surveying included topographic...

This project included the upgrade of the fire protection and potable water distribution systems for the Richmond DLA Aviation facility. Work also included the replacement of fire pumps with Variable Frequency Drive (VFD) pumps sized for six million gallons per day capacity and rated per the...

This project consisted of a $92 million expansion of an existing senior care facility.  It included full POD design and approval from both Henrico County and the City of Richmond. As a sub-consultant to THW Design, Inc. (Architects), Brockenbrough provided the survey and civil engineering...

The project was designed to VDOT and Chesterfield County Standards for a major arterial roadway and 45 mph minimum design speed. The plans were prepared using imperial units.   The two-lane roadway was widened to include a 16-foot raised median, two new traffic lanes, a shared use...

Brockenbrough was the lead electrical engineer to TransCore for VDOT on this $38.6M design-build project to improve safety and incident management.   Work included full responsibility for design of power distribution upgrades to approximately 85 ATM cabinets along I-66, serving new sign gantries, shoulder and lane control...

This project marked the third major tank replacement design Brockenbrough provided for Craney Island Fuel Terminal dating back to the 1980’s. The project provided 400,000 barrels of JP-5/F-76 storage and an additional 70,000 barrels of Reclaimed Fuel Oil (FOR) storage. The new tanks replaced nineteen circa...

Henrico County was looking to add educational space and classrooms for kindergarten through second grades at Mehfoud Elementary School. This addition included twelve state-of-the-art classrooms and three learning centers designed for small group instruction. The project also covered expansion and renovations to the existing cafeteria.   Services included planning, schematic...

The owner of this website has made a commitment to accessibility and inclusion, please report any problems that you encounter using the contact form on this website. This site uses the WP ADA Compliance Check plugin to enhance accessibility.