Wastewater treatment influent headworks at the Northwest Naval Support Activity for the Naval Facilities Engineering Command. The headworks include an auger screen for removal of solid trash, a grit screw for removal of particulate debris, and automatic controls.  The control systems for the auger screen...

This project included the design of a one million gallon elevated water storage tank that is 183 feet tall with concrete pedestal and mat foundation. Brockenbrough was responsible for the site design, water line extensions, and electrical power service.  The design included a preliminary engineering report...

This project included the upgrade of the fire protection and potable water distribution systems for the Richmond DLA Aviation facility. Work also included the replacement of fire pumps with Variable Frequency Drive (VFD) pumps sized for six million gallons per day capacity and rated per the...

For this project, Brockenbrough was responsible for design of utility adjustments in the City of Richmond along Midlothian Turnpike and German School Road due to conflicts with roadway and recent major drainage improvements. This very congested and heavily traveled area required significant coordination with the...

This project included the design of a two million gallon elevated water storage tank that is 175 feet tall with concrete pedestal and mat foundation. Brockenbrough was responsible for the site design, water line extensions, and electrical power service.  Designs were also created for a piping...