Brockenbrough was the Prime Consultant for replacement of three Interstate Welcome Centers and Safety Rest Areas.  The existing facilities were demolished and replaced with a new “prototype” design.  Work was completed under a record breaking fast-track design and construction period.  Design phase through full BCOM...

Brockenbrough provided complete right-of-way and construction plans, and construction administration for improvements to Old Bermuda Hundred Road and Old Stage Road in Chesterfield County.  Work included widening and reconstruction of 2,200 linear feet of roadway including intersection safety improvements.  Brockenbrough was responsible for surveying, roadway...

Brockenbrough provided structural and civil engineering for this new 225 foot pedestrian bridge on the University of Richmond campus.   Work included plans and specifications for a prefabricated steel truss bridge approximately 225’ long by 8’ wide.  The bridge was constructed of weathering steel with a composite deck and...

This project included park and trail improvements consisting of a new observation platform, a railroad trestle pedestrian bridge, replacement of a service road bridge, improved access to the mine ruins, and new trails.  Brockenbrough provided complete civil engineering, structural engineering and surveying.  Surveying included topographic...

This project included the upgrade of the fire protection and potable water distribution systems for the Richmond DLA Aviation facility. Work also included the replacement of fire pumps with Variable Frequency Drive (VFD) pumps sized for six million gallons per day capacity and rated per the...

This project consisted of a $92 million expansion of an existing senior care facility.  It included full POD design and approval from both Henrico County and the City of Richmond. As a sub-consultant to THW Design, Inc. (Architects), Brockenbrough provided the survey and civil engineering...

This project included the site and utility design of a new 15,000 square foot maintenance garage with 20 work area bays and an office area at the Virginia State Police Headquarters.   The site design included layout of the maintenance garage, drives and parking. It also included...

The project was designed to VDOT and Chesterfield County Standards for a major arterial roadway and 45 mph minimum design speed. The plans were prepared using imperial units.   The two-lane roadway was widened to include a 16-foot raised median, two new traffic lanes, a shared use...

This building includes a large training bay where industries can educate their employees on the use of new technology and manufacturing equipment. The facility contains a distance learning auditorium, computer labs, classrooms and offices. It was designed to project an image of a traditional educational building...

This project marked the third major tank replacement design Brockenbrough provided for Craney Island Fuel Terminal dating back to the 1980’s. The project provided 400,000 barrels of JP-5/F-76 storage and an additional 70,000 barrels of Reclaimed Fuel Oil (FOR) storage. The new tanks replaced nineteen circa...