Archive

Wastewater treatment influent headworks at the Northwest Naval Support Activity for the Naval Facilities Engineering Command. The headworks include an auger screen for removal of solid trash, a grit screw for removal of particulate debris, and automatic controls.  The control systems for the auger screen...

This project included the design of a one million gallon elevated water storage tank that is 183 feet tall with concrete pedestal and mat foundation. Brockenbrough was responsible for the site design, water line extensions, and electrical power service.  The design included a preliminary engineering report...

This project included design of a cricket field on three existing soccer fields totaling 7+ acres at Deep Run Park in Henrico County.  The field is in compliance with International Cricket Council (ICC) standards and is multi-use for both cricket and soccer.   Design elements included layout...

This project involved the design and construction of a low-profile, floating dock on the James River.  Design included new paved trails and access to two gangways with the ability to accommodate fluctuations in river level.  The dock is used for kayaks and canoes as well...

This project developed an approximately 2-acre portion of the park into a recreational area with playground and sprayground components.  Development included a 1,000 square-foot comfort station with a mechanical room, a 900 square foot picnic shelter, a 3,600 square foot playground and a 7,000 square...

This project included site design for a new 85,000 sf Joint Operations Center for VDOT and Virginia State Police located at the VDOT Richmond District Complex. Brockenbrough provided layout of buildings, parking, site features, clearing, grading, exterior drainage systems, water and sewer, erosion and sedimentation...

This 4,400-square foot bioretention basin is under construction and was designed to mitigate the increase of stormwater runoff and pollutants from the new development of impervious areas for a new building, gravel parking area with canopies, and loading dock.  This best management practice (BMP) treats...

Engineering, surveying and subsurface utility services were provided to design 84 new parking spaces for the employee parking lot, underground detention system.  The existing employee parking lot was restriped and the visitor parking lot was repaired....

The owner of this website has made a commitment to accessibility and inclusion, please report any problems that you encounter using the contact form on this website. This site uses the WP ADA Compliance Check plugin to enhance accessibility.