Brockenbrough was the lead electrical engineer to TransCore for VDOT on this $38.6M design-build project to improve safety and incident management.   Work included full responsibility for design of power distribution upgrades to approximately 85 ATM cabinets along I-66, serving new sign gantries, shoulder and lane control...

This building includes a large training bay where industries can educate their employees on the use of new technology and manufacturing equipment. The facility contains a distance learning auditorium, computer labs, classrooms and offices. It was designed to project an image of a traditional educational building...

This project marked the third major tank replacement design Brockenbrough provided for Craney Island Fuel Terminal dating back to the 1980’s. The project provided 400,000 barrels of JP-5/F-76 storage and an additional 70,000 barrels of Reclaimed Fuel Oil (FOR) storage. The new tanks replaced nineteen circa...

Naval Support Facility Diego Garcia is located on a coral atoll in the Indian Ocean. The footprint shaped island is located about 700 miles south of India, 1,500 miles east of Africa, and is part of the British Indian Ocean Territories. Both the Air Force...

Henrico County was looking to add educational space and classrooms for kindergarten through second grades at Mehfoud Elementary School. This addition included twelve state-of-the-art classrooms and three learning centers designed for small group instruction. The project also covered expansion and renovations to the existing cafeteria.   Services included planning, schematic...

This project involved renovation of all eight branches of the Richmond Public Library System as well as improvements to the Main Library. The primary focus was upgrading the technology infrastructure and replacing the lighting and interior finishes. Each branch was evaluated during schematic design. Changes...

Brockenbrough was responsible for the design of ten new or renovated customer service centers for the Virginia Department of Motor Vehicles.  Each center contained a state-of-the-art teller line designated to streamline the service process thereby creating a better experience for the customer and an ergonomically...

In preparation for the receipt of MV-22 helicopters, the existing parking apron striping was removed and a new parking plan was designed. Because of extreme high temperatures subjected to the concrete by the MV-22 down blast, special concrete coatings, heat resistant joint sealants and high temperature...

This project included the design of a two million gallon elevated water storage tank that is 175 feet tall with concrete pedestal and mat foundation. Brockenbrough was responsible for the site design, water line extensions, and electrical power service.  Designs were also created for a piping...

Brockenbrough was the Prime Consultant for replacement of three Interstate Welcome Centers and Safety Rest Areas.  The existing facilities were demolished and replaced with a new “prototype” design.  Work was completed under a record breaking fast-track design and construction period.  Design phase through full BCOM...