Brockenbrough provided staking of the site work associated with the new maintenance building, approximately 3,500 linear feet of roadway, 54 space parking lot, picnic facility, approximately 1,000 linear feet of trails, 2,000 linear feet of waterline and 1,500 linear feet of sanitary sewer....

Brockenbrough performed subsurface utility engineering designation and location on a 60-acre parcel at Westminster Canterbury. We mapped over 2 miles of water line, nearly 7 miles of electric line, 5,700 linear feet of gas line, and 60 sanitary and 270 storm structures. We provided the...

This project involved the design and construction of a low-profile, floating dock on the James River.  Design included new paved trails and access to two gangways with the ability to accommodate fluctuations in river level.  The dock is used for kayaks and canoes as well...

Brockenbrough was the Prime Consultant for replacement of three Interstate Welcome Centers and Safety Rest Areas.  The existing facilities were demolished and replaced with a new “prototype” design.  Work was completed under a record breaking fast-track design and construction period.  Design phase through full BCOM...

Brockenbrough provided complete right-of-way and construction plans, and construction administration for improvements to Old Bermuda Hundred Road and Old Stage Road in Chesterfield County.  Work included widening and reconstruction of 2,200 linear feet of roadway including intersection safety improvements.  Brockenbrough was responsible for surveying, roadway...

This project included park and trail improvements consisting of a new observation platform, a railroad trestle pedestrian bridge, replacement of a service road bridge, improved access to the mine ruins, and new trails.  Brockenbrough provided complete civil engineering, structural engineering and surveying.  Surveying included topographic...

This project included the upgrade of the fire protection and potable water distribution systems for the Richmond DLA Aviation facility. Work also included the replacement of fire pumps with Variable Frequency Drive (VFD) pumps sized for six million gallons per day capacity and rated per the...

This project consisted of a $92 million expansion of an existing senior care facility.  It included full POD design and approval from both Henrico County and the City of Richmond. As a sub-consultant to THW Design, Inc. (Architects), Brockenbrough provided the survey and civil engineering...

The project was designed to VDOT and Chesterfield County Standards for a major arterial roadway and 45 mph minimum design speed. The plans were prepared using imperial units.   The two-lane roadway was widened to include a 16-foot raised median, two new traffic lanes, a shared use...