Archive

Brockenbrough performed subsurface utility engineering designation and location on a 60-acre parcel at Westminster Canterbury. We mapped over 2 miles of water line, nearly 7 miles of electric line, 5,700 linear feet of gas line, and 60 sanitary and 270 storm structures. We provided the...

This project involved the design and construction of a low-profile, floating dock on the James River.  Design included new paved trails and access to two gangways with the ability to accommodate fluctuations in river level.  The dock is used for kayaks and canoes as well...

This project developed an approximately 2-acre portion of the park into a recreational area with playground and sprayground components.  Development included a 1,000 square-foot comfort station with a mechanical room, a 900 square foot picnic shelter, a 3,600 square foot playground and a 7,000 square...

This project included site design for a new 85,000 sf Joint Operations Center for VDOT and Virginia State Police located at the VDOT Richmond District Complex. Brockenbrough provided layout of buildings, parking, site features, clearing, grading, exterior drainage systems, water and sewer, erosion and sedimentation...

This 4,400-square foot bioretention basin is under construction and was designed to mitigate the increase of stormwater runoff and pollutants from the new development of impervious areas for a new building, gravel parking area with canopies, and loading dock.  This best management practice (BMP) treats...

Engineering, surveying and subsurface utility services were provided to design 84 new parking spaces for the employee parking lot, underground detention system.  The existing employee parking lot was restriped and the visitor parking lot was repaired....

DFSP Point Loma is the largest DoD Fuel Storage Facility on the West Coast and directly supports the U.S. Navy’s Third Fleet based in San Diego.  Personnel from the Brockenbrough team performed an API-653 Out-of-Service inspection on Oil-Water Storage Tank 11 at DFSP Point Loma,...

Brockenbrough was the Prime Consultant for replacement of three Interstate Welcome Centers and Safety Rest Areas.  The existing facilities were demolished and replaced with a new “prototype” design.  Work was completed under a record breaking fast-track design and construction period.  Design phase through full BCOM...

The owner of this website has made a commitment to accessibility and inclusion, please report any problems that you encounter using the contact form on this website. This site uses the WP ADA Compliance Check plugin to enhance accessibility.